This case study, which focuses on the first site to commission a PX U40 in early 2022—a lithium iron phosphate (LFP) plant in China—shows a significant reduction in both energy consumption and costs using the PX Pressure Exchanger for the second reverse osmosis stage and the PX U40 for the ultra high-pressure reverse osmosis stage to capture energy otherwise wasted in the wastewater treatment process.
Download pdf
Back to Resources
First PX U40 for Wastewater Treatment Yields Savings with High Performance
Case Study / Wastewater
Download pdf![First PX U40 for Wastewater Treatment Yields Savings with High Performance brochure](https://energyrecovery.com/wp-content/uploads/2023/11/Sinochem-U40-cover-300x200-1.png)