Two paths into the same outcome

Most retrofit projects fall into one of two categories. The approach is the same in either case: assess the system, size the right PX and pump configuration, install with minimal disruption.

SWRO: Legacy ERD Replacement

Many SWRO plants built in the late 1990s and 2000s were commissioned with older energy recovery technology. After years of high-pressure operation, the case for replacement is straightforward. We’ve completed both small and large-scale ERD conversions at leading desalination facilities.

  • Applicable to all plant sizes, as small as 100 m³/day (18.35 gpm) to over 50,000 m³/day (9,172.64 gpm)
  • PX devices designed for direct installation into existing configurations
  • Commissioning support included; Energy Recovery engineers available for startup
ERI products being used in a system
Low-Pressure PX Installation

Wastewater & Brackish Systems: Adding an ERD

Whether industrial wastewater, reuse, or brackish RO systems, these processes operate at pressures where recovering energy delivers immediate savings. Many systems were designed without an ERD, and adding a PX can substantially reduce operating costs without a full plant redesign.

  • Reduces electricity use in single and multiple stage RO designs
  • Completed energy recovery retrofits on existing brackish and reuse systems, with our engineers on site through commissioning
  • PX options available for operating pressures anywhere from 5.5 bar – 120 bar (80-1740 psi)
  • Energy recovery assessment available to quantify impact

Systems we retrofit

RO systems with no ERD

Icon of a gear.

Legacy ERDs

Icon of expanding arrows

Expansions and capacity increases

PowerModel Pro on a laptop

Frequently Asked Questions

In most cases, retrofits are completed rack by rack, allowing ongoing production from the remaining trains during installation. Our engineering & field service teams work with your operators to schedule installation around your production needs, and commissioning is typically completed within days.

Yes. PX devices and pumps are designed to fit existing rack infrastructure, so connections, piping, and overall plant layout typically require minimal modification. We have completed conversions at plants from 100 to over 500,000 m³/day.

Start with an energy assessment. Using your operating pressure, recovery rate, and system capacity, we will model what energy recovery looks like in your specific system. Power Model Pro handles self-service modeling, or contact our team for a detailed analysis.

Often, yes. Replacing older ERDs or pumps with current Energy Recovery technology typically frees up footprint and reduces pump duty, which can make room for added capacity or a second stage in the existing building.